To see all content, you will need the current version of Adobe Flash Player.

DORECO HOMEPAGE 1st Aid CEBUANA LIST OF MEMBER-CONSUMERS FOR CUSTOMERS Brownouts Electric Cnsmptn Eltrc. Service Con. Energy & Safety Tips Pahimagno hotline numbers Guestbook Past/Present/Future Activities About us ABOUT DORECO Awards LEADERS best practices After Typhoon Pablo PABLO2 Pablo 3 RESTORATION AFTER PABLO NRECA-U.S. TRIP POWER RATES May 2016 June 2016 July 2016 AUG. 2016 Sept.2016 Oct.2016 Nov. 2016 Dec. 2016 Jan. 2017 Feb. 2017 March 2017 April 2017 

Eltrc. Service Con.

How To Apply For Electric Service Connection?

Step 1. The applicant is required to attend the Pre- Membership Education Seminar(PMES) at DORECO office. 2. After the PMES, the applicant will secure forms(application form for electrical permit) from the City Engineers Office. 3. Upon securing the application form for electrical permit & plan,the applicant will see a Professional Electrical Engineer. 4. With the application form for electrical permit properly filled-up, the applicant will go back to the City Engineers Office to file his/her application for Electrical permit. 5. After securing the electrical permit, the applicant will now proceed to the Member Services Division (MSD)-DORECO for processing of his/her electric service application and pay the corresponding fees such as membership fee and and service fees. Please bring 2 copies 1x1 ID picture,valid ID and P 5.00 membership fee.

PAYMENT FOR APPLICATION(RESIDENTIAL) Service Fee P 650.00 P 650.00 VAT 12 % 78.00 78.00 Membership Fee 5.00 5.00 Power Bill Deposit 500.00 500.00 Meter Deposit CL100 - Fuse link 180.00 0.00 Total P 1,413.00 P 1,233.00 ========= ========*Note: For renting/transcient consumer: - Meter Deposit - Power bill deposit shall be computed based on estimated load.COMMERCIAL TYPE OF CONSUMER: Electrical Permit Pre - membership seminarPAYMENT FOR APPLICATION Service Fee P 1,200.00 P 1,200.00 VAT 12 % 144.00 144.00 Fuse link 180.00 Meter Deposit CL100 ---------------- ---------------- Total P 1,524.00 1,344.00 ========= ========= Note: Power bill deposit shall be computed based on estimated load.PUBLIC BUILDING TYPE OF CONSUMER: Electrical Permit Pre - membership seminarPAYMENT FOR APPLICATION Service Fee P 650.00 P 650.00 VAT 12 % 78.00 78.00 Fuse link 180.00 Meter Deposit CL100 ---------------- ---------------- Total P 908.00 728.00 ========= =========

Applying for another connection: -meter deposit P 1,000.00 is required.

Pre-membership orientation seminar will be held every Tuesday and Thursday from 9:00 am to 10:30 am.

Policy No.6-3A-2 Policy on Reconnection Fee as Amended: Residential P50.00 Commercial (Low Voltage) (consuming above 500 kwh - P500.00 V A T (12%) 6.00 60.00 Total 56.00 560.00 Industrial 1,000.00 Commercial (Higher Voltage) 500.00 V A T (12%) 120.00 60.00 Total 1,120.00 560.00

D O R E C O

Davao Oriental Electric Cooperative, Inc.



Madang ,National Highway,City of Mati, Davao Oriental, Philippines